Long Avenue Resurfacing

Contact us

The surface layer on Long Avenue between 8th Street to 12th Street will be removed and replaced with new, smooth pavement in 2024. The project will also include select pedestrian ramp improvements and pavement striping.

Land surveying crews will be working in the project area before, during, and immediately after construction.

There will be no cost to property owners for this project.

Selected Contractor: Bituminous Roadways 

Subscribe to Long Avenue updates

White Bear Lake Area Schools will be doing work at the intersection of 8th Street and Highway 61 as their own separate project.

Learn more about their project

Timeline

  • 2024 Land surveying work is currently underway.
  • Summer 2024: Construction is set to begin.

Project Area

Long Avenue project area map