Kohler Road Drainage Reconstruction

Contact us

This drainage reconstruction project is located on Kohler Road at Lambert Creek in the City of Vadnais Heights and will be completed in 2024.

We will be replacing plastic stormwater pipes and structures with concrete pipes and structures. This will include excavation and water diversion (pumping over the road). In addition, more soil will be brought in to make the roadside embankment more drivable. 

Traffic Impacts

The project will require a detour since a full road closure at the project location will be needed.

Kohler road detour map